• Close to 1 million cubic metres (about 400 Olympic-size swimming pools) of loose material was cleared away.
  • More than 200 sites along SH1 and 900 sites on the main trunk railway line were damaged.
  • The response cleared 90 slips and replaced numerous bridges.
  • More than 1,700 people from 350 organisations worked on the response.